ALTAMONT PASS, Alameda County — A proposal for a large electricity-storage facility in the Altamont Pass Wind Resource Area is under state review, according to the California Energy Commission.
What is proposed?
The commission’s Viracocha Hill project page describes a battery energy storage facility rated at 90.7 megawatts and 362.8 megawatt-hours. Applicant Reclaimed Wind, LLC, proposes a developed footprint of approximately 17 acres on a much larger 443-acre parcel in eastern Alameda County. Plans include an approximately 14-acre battery yard, substation, equipment and stormwater facilities, improvements to an access road and a new connection to electrical infrastructure near Ralph Substation.
The power rating describes how much electricity the facility could deliver at one time; the energy figure describes storage capacity. These numbers should not be confused with the number of megawatts of new wind turbines operating at the same location.
Has the state approved construction?
No final approval is established. The commission labels the project Under Review under docket 25-OPT-01. The public page also identifies a November 14, 2025 letter determining the application incomplete. A proposal and a regulatory docket are not permission to begin construction or proof of a functioning battery facility.
How to participate
Residents concerned about safety, fire response, roads, environmental effects or land compatibility can review the official docket and public-comment links. The state lists project manager Eric Veerkamp at 916-661-8458 and STEPsiting@energy.ca.gov. Public participation staff can be contacted at publicadvisor@energy.ca.gov.
Any future hearing date or deadline must be checked in the current docket, not inferred from an earlier preliminary filing.
Source: California Energy Commission, Viracocha Hill Battery Energy Storage System Project, docket 25-OPT-01, checked October 31, 2026. No copyrighted project graphics reproduced.
Help this community newspaper grow
Your support helps build coverage for the people and places this local newspaper serves.
Donate once by card ↗Support Altamont News
Choose how to support Altamont News:
Credit / Debit Card via StripeChoose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Altamont News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Altamont News
- Altamont Wind Farm Rules Focus on Protecting Golden Eagles and Other Birds of Prey →
- Mulqueeney Ranch Wind Repowering in Altamont Pass: Why a 2024 Revised Permit Matters →
- Interstate 580 Altamont Pass Storm-Repair Records Include Slope Work and Wildlife Safeguards →
- Grant Line Road Roundabout Proposal Includes Altamont Pass Road Intersection Near Mountain House →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.